Main stages of repair in the apartment.
How to begin repair works of the apartment?
The very first stage of the repair work of old apartments is the destruction and taking apart first off of the dilapidated walls and partition walls, eliminating the wall and ceiling coating. This stage is among the most "dirty" phases of the repair.
One more amongst the most crucial and "dirty" works is the window block replacement. It is essential to do this first off because dirt and dust will be unallowable throughout following stages and it is prohibited at all to open windows during painting and wallpaper works (large drops of the temperature level and wetness are unallowable). After installing windows and windowsills it is essential to load them right away in polyethylene movie and to cover windowsills in addition by the fiberboard (in order to prevent scratches).
The following stage is wiring. Wiring can be set up in walls or along the flooring. Circuitry is made inside the pipelines to ensure electrical security and increase reliability. The pipeline safeguards wiring from external damages and permits to replace the wire totally without breaking walls and flooring merely by inserting the brand-new wire instead of the old one.
House Painting follows the electrical wiring. The regular error throughout the simultaneous conducting of such works occurs when workers forget to set out one of the cables and home painters have currently plastered and ravelled the wall. As a result, additional works are necessary to seal goes after on the finished wall. The locations of the feed switch and wall outlet blocked drain article place and their number need to be thought-out beforehand. The plan of power circuitry is normally consisted of into the design project.
Later on the system should be ready to service in case of failures. In addition to the wirings, the telephone cable television and the television cable are laid out. The power cable should not be set out near the telephone and antenna cables to prevent noise pickup and disturbance. The most strange moment is setting out the TV cable. In order to make two (or three) television set in the apartment or condo the 2nd cable television is typically just "firmly soldered" in parallel, so the cable television resistance is reduced. As an outcome, the display screen quality is weakened, numerous programs can't be gotten and etc. In order to prevent such scenario it is required to welcome a specialist with special equipment. He will measure the signal level of the each TV-feeder and install TV-amplifiers or TV-filters.
Painting is the most long-lasting procedure, that is why it is carried out at the same time in all facilities, if it is possible. Hold-ups are linked with the technology. Each applied layer of the plaster (or filling out completing) should dry completely before the work will continue.
Works in hygienic plans and the kitchen start at the same time with house painting. It is better to meet so-called "unclean" operate in the first place and simultaneously. In accordance with the plan of the sanitary professional place welding, wall chasing and pipe run are performed. Steam radiator admissions are prepared, taps and brackets are installed, but radiators are not installed.
Then works in hygienic plans are conducted according to the strategy. The bath is mounted, then walls are smoothed out and the tile is laid on walls. The list below phase is putting together ceiling and laying tiles on the floor. And at last other sanitary devices, mixers and accessories are mounted.
After circuitry, installation of rosette plates and terminal boxes the voltage is checked in all point. Ends of wiring are insulated and laid out into rosette plates. Sockets and breakers are not installed during this phase in order to save their surface area appearance. The surface Go to the website puttying of walls is carried out all at once. The technically precise control of drying of the layer of the plaster (filling) is performed by drymeter. It is an unique instrument that measures wetness of the material.
The following stage is the procedure of fill. Fill can be made with various materials-- from usual masonry cement-sand mixture to self-aligning floors. The advantage of the basic mix is its cheapness, the disadvantage is that such mix is much more difficult aligned at the level and the last dry time of such fill is 40 days, only then the next stage of the work with floor can be carried out, i.e. the period is too long. Self-leveling self-aligning floors are a lot more pricey, however more technological. Aligning happens practically "immediately" i.e. fluid option of mixture is put out, then it runs and you receive the horizontal surface. The final dry time is 15 days i.e. you have considerable time economy. The system "warm floor" is set up into the fill. If the so-called "damp procedures" are inapplicable the innovation of the dry lining up (the fill innovation) is used bases for floors with adjustable floor battens are mounted.
After fill door boxes and door are installed. Installation of doors must take into the account thickness of future floor covering. After installation the door can be taken off its hinges and got rid of up until completion of repair work or packed into polyethylene movie to secure from damages. Simultaneously ceiling can be painted and the tile can be laid in that facilities where it was planned. The tile should be laid on the absolutely dry overlay.

In facilities where finish covering of the flooring is laminated floor covering or parquet stockpile, the normal wallpapers are pasted (not for painting) in the first place. Then the floor covering is mounted.
If finish covering of the floor is the block parquet, the parquet is laid in the first place, then it is scraped and covered by one layer of lacquer. After this the ordinary wall-papers are pasted and the parquet is covered by the rest layers of lacquer (depending upon the quality of the parquet and lacquer). The discussed repercussion is linked just with such rushing process when the great quantity of dust is produced. In spite of the reality that good floor grinders are geared up with the vacuum, the adequate quantity of dust is sped up on surrounding topics including walls. Dust is extremely acerbic and is terribly washed off. That is why in order not to harm wallpapers, they are pasted after rushing and in order the parquet do not absorb the surplus wetness it is covered by the one layer of lacquer before wallpaper pasting.
After this the main works can be considered to be completed. It is left only to set up the plinths, decorative components, breakers and sockets, drape holders, to hang doors, plant-bands and others.
In conclusion it is required to note that the sequence of works was listed in basic and can alter depending upon the certain scenario-- the variety of rooms in premise, your resources, peculiarities of the construction of the multilevel properties. It is based on common sense and every person capable of analysis can separately produce such a sequence.